Current Projects

Under Construction

Folsom Railroad Block Parking Structure, Sacramento Region

The Folsom Railroad Block Parking Structure is a 4-level, 122,715 square foot mixed-use parking structure with approximately 314 spaces to serve the Historic District area.The project is expected to be complete January 2008.

Gateway Center, Seattle Region

Gateway Center is a ground-up project for Evergreen Hospital that will add a 5-story medical office building with an underground parking garage to Evergreen’s Kirkland campus. The 100,000 square foot medical office building will be built over two levels of parking, (each 100,000 square feet) that accommodates over 600 stalls. The project incorporates a transit center for Sound Transit and King County Metro, and a pedestrian plaza.

City Center Plaza, Seattle Region

Rising 26 stories in the downtown core, City Center Plaza spans the area adjacent to the transit center and the new City Hall, and will be the largest office building in Bellevue, WA. Scheduled for completion in 2008, the 1.1 million square foot building will provide over 600,000 square feet of office space above five levels of underground parking.

South Coast Plaza Renovation, Los Angeles Region

The second phase of the renovations at the South Coast Plaza Retail Center involve an additional 120,000 square feet of new travertine flooring, balcony rails and custom teakwood planters/bench seating. An elegant custom glass elevator will also be installed. This project is expected to be complete in November of 2007.

CarMax Torrance, Los Angeles Region

</"> The brand new CarMax Torrance project will be delivered as a turn-key design-build automotive dealership with a 12,000 square foot showroom, office space, service center and two levels of cast-in-place structured parking. With innovative value engineering, HSW helped to save the client almost $5 Million. This project is scheduled to be complete in July of 2007.

Kabuki Theater, San Francisco Region

Owned by Sundance Cinemas, this Japan Town (San Francisco) project involves renovating eight cinemas from the AMC theater style to a higher-end, independent film style. The new design reconfigures the seating to allow for better viewing, while the theater complex offers a restaurant and bar for a more enjoyable experience. The theater renovation will be complete in April 2007, and the design for the restaurant, bar and common areas will soon be released.

Jack London Square, San Francisco Region

The first part of Phase I of this mixed-use building encompasses a two story, steel framed 32,000 square-foot building. The first floor will offer a restaurant and retail shops, and the second floor will provide office space. The next part of Phase I includes a six-story, open air market and retail shops office space. It also includes some site work for an outdoor plaza. The last part of phase I consists of constructing a glass pavilion. Still in the concept stage, Phase II consists of a 12-story hotel, 200 plus keys, and additional retail space.
CRC Instructional Lab Expansion

We are expanding the existing CRC Instructional Lab building and canopy for Los Rios Community College in Sacramento, California. Read more...

FedEx Ground Distribution Center Expansion

This project includes a 50,000-square-foot pre-engineered metal building expansion to the existing 89,000-square-foot ground distribution center.Read more...

Gateway Center Gateway Center

Gateway Center features a 5-story, 100,000-square-foot medical office building with two levels of underground parking for the Evergreen Hospital. Read more...

Hotel 480

We are currently renovating the interior of this 30-story, 403 guestroom hotel located near San Francisco's Union Square.Read more...

Macy's at SanTan

We are constructing this Macy's store at the new SanTan Shopping Center in Gilbert, Arizona.  The store will anchor the main retail street in this open air shopping center.  Read more...

Mall at Northgate

We are currently working on the interior and exterior renovation of this mall located in San Rafael, California.  This project is targeting LEED™ Gold certification. Read more...

Oscar de la Hoya Animo Charter High School

We are currently constructing a new, 41,000-square-foot high school in Los Angeles, California. The project will be complete in time for the 2009 school year. Read more...

ProLogis Park Riverside

We are currently working on the design and infrastructure of this 2,600,000-square-foot distribution facility. Read more...

River Park

This project includes two separate ground-up projects in Redmond, Washington.Read more...

Scottsdale Center for Performing Arts

We are currently constructing this highly visible and well known project in the Scottsdale community.  Constructed over two phases, this project consists of improvements to the atrium and other occupied locations.  Read more...

South Meadows Middle School
Construction is currently underway at this news flagship middle school for the Hillsboro School District. Read more...

Stanford Court Renaissance Hotel

The Stanford Court Renaissance Hotel is a 258,450-square-foot hotel currently under a complete renovation in San Francisco. Read more...

The Boys and Girls Club of Metropolitan Phoenix

We are currently constructing two buildings for the voluntary nonprofit organization, Boys and Girls Club of Metropolitan Phoenix. Read more...

UC Hastings College of the Law Parking Structure

The UC Hastings College of the Law project is a 159,000-square-foot, 7-story mixed-use facility that consists of one floor of retail space and six floors of parking space.Read more...

Ventura Community College

We are constructing two new ground-up buildings and working on a phased demolition of two existing buildings at this community college. Read more...

Yale Building

This 5-story building will be the new home to Howard S. Wright Constructors' Seattle regional offices when complete in 2010. Read more...